欢迎访问珠海市椿田机械科技有限公司官网!
Solution
Quality oriented and value symbiosis
/
Non_standard

Upgrading solutions for non-standard equipment

▼  Upgrading solutions for non-standard automation equipment

1. Personalization
The equipment transformation must meet the needs of the development of production technology, meet the actual situation of the factory, fully meet the needs of the company for automated production, and solve key problems.
2. Possibility
Fully consider the technical possibility, judge whether the equipment is worthy of transformation and utilization, and whether it is possible to improve power and efficiency.
3. Maximize
In view of the impact of equipment on product quality, quantity, cost, production safety, energy consumption and environmental protection, on the premise of achieving practical benefits, improve the degree and level of automation and output.
4. Economy
Professional technicians conduct technical and economic analysis to save transformation costs on the premise of meeting the requirements of automatic production.

imgboxbg

Project manager

Confirm development projects and investigate customer needs. Organize the formulation of the project plan, control the project progress, and ensure the realization of the project objectives.

imgboxbg

Development Engineer

Draw up the electrical scheme demonstration and scheme analysis, confirm the electrical and hydraulic pressure of the equipment, evaluate the feasibility of the equipment, evaluate the cost of the equipment structure, risk assessment, etc.

imgboxbg

Mechanical engineer

Mechanical scheme design, determine the transformation scheme of automatic non-standard equipment, and cooperate with procurement to process or purchase parts by classification.

imgboxbg

Purchaser

According to the design results of the mechanical engineer and the development engineer, confirm the parts, purchase the standard parts, carry out self-processing or outsourcing processing with non-standard parts, and keep communicating with the engineer about the cycle of relevant purchased parts and substitutes.

imgboxbg

Mechanical installation

After the mechanical parts are purchased or produced in place, the equipment shall be installed according to the mechanical drawings.

imgboxbg

Equipment installation

After the mechanical installation is completed, the equipment parts shall be installed and wired according to the drawings, and the equipment shall be calibrated and signal debugged.

imgboxbg

Commissioning and handover

After debugging by the engineer, Party B shall conduct quality inspection. After passing the inspection, the whole machine of the equipment shall be handed over
Clean the appearance, confirm the safety protection devices, and remove the damaged parts drawings and spare parts.

CHUNTIAN MACHINERY

Quality oriented and value symbiosis

Contact

Address: No.8, Chuangye East Road, Xiaolin District, LIANGANG Industrial Zone, Jinwan District, Zhuhai

Copyright © 2022 Zhuhai ChunTian Machine Technology Co.,Ltd.  粤ICP备2021150249号-1